Todo List 01/11/05 Setup SVN and check in my code to a code versioning system. Start UI redesign for Saturn Finish up preliminary UML diagrams for Saturn Upgrade linux laptop to gnome-blog 0.8 Install Dropline Drivel Edit the picture theme to include bullets and some new styling. Upgrade to movable type 3.X